Home
AboutUs
Models
ContactUs
Projects
Wednesday, January 06, 2016

MANSURI-BANGESTAN FIELD

.onshore
.heavy
Operator:
.NISOC

Location of Mansuri Field

This field is located 40 km south of Ahwaz field

Disc. Prod. init. Dim. Seismic Data No. Wells Formation API
year year kmxkm       Degrees
1962 1990 43x6 3D 96 (71 prod. ) Bangestan 20-25

General specifications

Based on NISOC studies in 2009, production of 75 MSTB/D from the Bangestan reservoir is possible

Considering the reservoir performance, it is suggested that new studies with the aim of possibility of using EOR and IOR methods (such as gas lift with respect to wells water cut, installation of down-hole pumps and hydraulic fracturing) being investigated.

A comprehensive study of the field has been done by NISOC recently.

Field STOIP Cumulative Production Formation (Up to now) Current Production Total Estimated Production
  MMBbl MMBbl MMBbl MMBbl
Mansuri Bangestan 15142 337 54 To be proposed
by contractor

 

 

 
Rate
 
 



This Page Views: 1114





2015 All Right Reseved
Best view in 1024*768